Monday, February 06, 2012
Subscribe to the CCPA YouTube Channel Join the group! Become a fan!
 You are here:   PromotionBlog
 
Blog List
 
Blog

Standardized procedures and training of inspectors is required to determine pipeline and culvert performance. Post installation inspection and testing is needed to verify conformance with design, determine initial condition and performance, verify pay items and requests, set a baseline for future inspections, and verification of structural strength of installation. Post installation inspections are often part of a performance-based specification.

Read More »

Archive
Search
Contact

General Manager: Grant Lee
Email: info@ccpa.com
Tel: 905.877.5369

Privacy Statement | Terms Of Use
Copyright 2011 by CCPA